Tungsten Copper Electrodes — tungsten-copper-electrodes-d01.jpg
Tungsten Copper Electrodes — tungsten-copper-electrodes-d02.jpg
Copper Alloy Products

Tungsten Copper Electrodes

WCu alloy electrodes combining tungsten's hardness and high melting point with copper's conductivity — outstanding arc erosion resistance, anti-adhesion and heat dissipation for EDM, resistance welding and high-voltage discharge.

Materials
Tungsten copper (WCu), copper content 6–90%
Features
Higher erosion speed and lower wear than copper/graphite, accurate shape retention, customizable copper content 6–90%, small-batch multi-specification supply
Application
EDM electrodes for hardened steel, tungsten carbide and superalloy molds; projection and butt resistance welding electrodes; high-voltage vacuum discharge tube electrodes.

Specifications

ParameterValue
MaterialWCu (tungsten copper)
Copper Content6–90 wt% (customizable)
ProcessIsostatic pressing + sintered W skeleton + Cu infiltration; die pressing / extrusion / injection molding
FormsSheets, rods, tubes, plates, complex-shaped parts
Electrode TypesEDM, resistance welding, high-voltage discharge
FAQ

Frequently Asked Questions

What materials and process are used for Tungsten Copper Electrodes?

Tungsten Copper Electrodes is made from Tungsten copper (WCu), copper content 6–90% and is formed by MIM/PM (metal injection molding / powder metallurgy) near-net-shape and sintered to a relative density of ≥ 98%, which keeps mechanical properties close to wrought material.

What are the key specifications of Tungsten Copper Electrodes?

Typical specifications: Material: WCu (tungsten copper); Copper Content: 6–90 wt% (customizable); Process: Isostatic pressing + sintered W skeleton + Cu infiltration; die pressing / extrusion / injection molding. The full parameter list is in the specifications table on this page; custom requirements can be discussed against your drawing.

What is the MOQ and lead time for Tungsten Copper Electrodes?

MOQ is 1000 pcs. Mold lead time is about 20 days (mold fee typically RMB 20–40k depending on part geometry), and production lead time is about 7 days once the mold is validated; secondary processing adds 3–5 days.

Related Applications