Contact Us

Contact Us

Tell us about your project — our engineers will get back to you within one business day.

Contact Information

  • Address
    No. 4 Canghai 4th Road, Yonghe Economic Zone, Huangpu District, Guangzhou 511356, China
  • Tel
    +86-20-62283111
  • English Inquiries (Leo Zhao)
    +86 18682434919
  • Email
    leon.zhao@kingmagnet.com
Product Catalog (PDF)

Send a Message

Loading verification…

Drag to complete the puzzle

FAQ

Frequently Asked Questions

Answers to the most common questions about MIM materials, tolerances, lead time and tooling.

Can you make this material?

Iron-base, stainless steel, soft magnetic and copper alloys are all feasible; zinc and aluminum alloys cannot be made with MIM.

What density can you reach?

Relative density above 98%: iron-base 7.5–7.7 g/cm³, stainless steel 7.6–7.8 g/cm³, pure copper above 8.4 g/cm³.

What tolerances can you hold?

Generally ±0.5% of the dimension; smaller dimensions can be controlled to ±0.3%.

What surface roughness is achievable?

As-sintered parts are typically Ra 1.0 µm; polishing can reach a mirror finish.

What hardness can you reach?

Hardness depends on the material; parts with specific hardness requirements generally need heat treatment.

How long is the lead time?

Tooling takes about 20 days and production about 7 days; secondary processing adds 3–5 days.

How much does tooling cost?

Typically RMB 20,000–40,000 (most around 30,000+), covering one injection mold and one sizing mold.

What is the minimum order quantity?

1,000 pieces or more.