Tungsten Copper Electrical Contacts — tungsten-copper-electrical-contacts-d01.jpg
Tungsten Copper Electrical Contacts — tungsten-copper-electrical-contacts-d04.jpg
Tungsten Copper Electrical Contacts — tungsten-copper-electrical-contacts-d05.jpg
Tungsten Copper Electrical Contacts — tungsten-copper-electrical-contacts-d02.jpg
Iron Base Alloy Steel Products

Tungsten Copper Electrical Contacts

W-Cu electrical contacts for high-current, high-voltage switching — tungsten's arc resistance combined with copper's conductivity for reliable performance under repeated switching cycles.

Materials
Tungsten copper (W-Cu), W70Cu30 / W80Cu20 etc.
Features
High electrical and thermal conductivity, exceptional arc erosion resistance, uniform microstructure via PM infiltration, tight tolerances for automated assembly, plating compatible
Application
High-voltage circuit breakers and switches, power distribution systems, industrial and utility switchgear, automated contact assemblies, aerospace and defense electrical systems.

Specifications

ParameterValue
GradesW70Cu30 / W80Cu20 (W70–W90Cu)
ProcessPM infiltration, near-net-shape / PM 渗铜近净成形
FAQ

Frequently Asked Questions

What materials and process are used for Tungsten Copper Electrical Contacts?

Tungsten Copper Electrical Contacts is made from Tungsten copper (W-Cu), W70Cu30 / W80Cu20 etc. and is formed by MIM/PM (metal injection molding / powder metallurgy) near-net-shape and sintered to a relative density of ≥ 98%, which keeps mechanical properties close to wrought material.

What are the key specifications of Tungsten Copper Electrical Contacts?

Typical specifications: Grades: W70Cu30 / W80Cu20 (W70–W90Cu); Process: PM infiltration, near-net-shape / PM 渗铜近净成形. The full parameter list is in the specifications table on this page; custom requirements can be discussed against your drawing.

What is the MOQ and lead time for Tungsten Copper Electrical Contacts?

MOQ is 1000 pcs. Mold lead time is about 20 days (mold fee typically RMB 20–40k depending on part geometry), and production lead time is about 7 days once the mold is validated; secondary processing adds 3–5 days.

Related Applications