Tungsten Alloy Vibration Dampers — tungsten-alloy-vibration-dampers-d01.jpg
Tungsten Alloy Vibration Dampers — tungsten-alloy-vibration-dampers-d03.jpg
Tungsten Alloy Vibration Dampers — tungsten-alloy-vibration-dampers-d04.jpg
Tungsten Alloy Vibration Dampers — tungsten-alloy-vibration-dampers-d05.jpg
Iron Base Alloy Steel Products

Tungsten Alloy Vibration Dampers

High-density tungsten vibration dampers that absorb vibration and stabilize dynamic systems in aerospace, automotive, micro-mechanical and industrial applications — compact size, custom geometries.

Materials
W-Ni-Fe tungsten alloy (self-developed powders)
Features
Density up to 18.5 g/cm³ for maximum damping efficiency, excellent fatigue and impact resistance, fine CNC machining for shapes/holes/slots, stable under thermal cycling and repeated load
Application
Aerospace mechanisms (satellite and navigation stabilization), precision gyroscopes and sensors, automotive and industrial damping assemblies, robotics and high-speed machinery, defense systems and instrumentation.

Specifications

ParameterValue
DensityUp to 18.5 g/cm³
Alloy SystemW-Ni-Fe
FAQ

Frequently Asked Questions

What materials and process are used for Tungsten Alloy Vibration Dampers?

Tungsten Alloy Vibration Dampers is made from W-Ni-Fe tungsten alloy (self-developed powders) and is formed by MIM/PM (metal injection molding / powder metallurgy) near-net-shape and sintered to a relative density of ≥ 98%, which keeps mechanical properties close to wrought material.

What are the key specifications of Tungsten Alloy Vibration Dampers?

Typical specifications: Density: Up to 18.5 g/cm³; Alloy System: W-Ni-Fe. The full parameter list is in the specifications table on this page; custom requirements can be discussed against your drawing.

What is the MOQ and lead time for Tungsten Alloy Vibration Dampers?

MOQ is 1000 pcs. Mold lead time is about 20 days (mold fee typically RMB 20–40k depending on part geometry), and production lead time is about 7 days once the mold is validated; secondary processing adds 3–5 days.