Tungsten Alloy Missile Guidance System Counterweight — tungsten-alloy-missile-guidance-system-d01.jpg
Tungsten Alloy Missile Guidance System Counterweight — tungsten-alloy-missile-guidance-system-d02.jpg
Tungsten Alloy Missile Guidance System Counterweight — tungsten-alloy-missile-guidance-system-d03.jpg
Aerospace Tungsten Alloy Weights

Tungsten Alloy Missile Guidance System Counterweight

Class 3 heavy alloy inertial stabilization block for guidance electronics and seeker heads — 18.0–18.5 g/cm³, ≥ 800 MPa tensile strength, ISO G1.0 dynamic balancing, non-magnetic W-Ni-Cu variant available.

Materials
Class 3 heavy alloy; non-magnetic W-Ni-Cu available
Features
Exceptional G-shock endurance, ISO G1.0 compliant balancing, electromagnetic neutrality around optical sensors, multi-cavity high-volume tooling
Application
Tactical strike missiles, anti-aircraft defense systems, precision-guided munitions (PGMs).

Specifications

ParameterValue
Alloy ClassClass 3 Heavy Alloy
Density Range18.0 – 18.5 g/cm³
Tensile Strength≥ 800 MPa
Dynamic BalancingISO G1.0 Compliant
Magnetic PropertiesAvailable in Non-Magnetic W-Ni-Cu
FAQ

Frequently Asked Questions

What materials and process are used for Tungsten Alloy Missile Guidance System Counterweight?

Tungsten Alloy Missile Guidance System Counterweight is made from Class 3 heavy alloy; non-magnetic W-Ni-Cu available and is formed by MIM/PM (metal injection molding / powder metallurgy) near-net-shape and sintered to a relative density of ≥ 98%, which keeps mechanical properties close to wrought material.

What are the key specifications of Tungsten Alloy Missile Guidance System Counterweight?

Typical specifications: Alloy Class: Class 3 Heavy Alloy; Density Range: 18.0 – 18.5 g/cm³; Tensile Strength: ≥ 800 MPa. The full parameter list is in the specifications table on this page; custom requirements can be discussed against your drawing.

What is the MOQ and lead time for Tungsten Alloy Missile Guidance System Counterweight?

MOQ is 1000 pcs. Mold lead time is about 20 days (mold fee typically RMB 20–40k depending on part geometry), and production lead time is about 7 days once the mold is validated; secondary processing adds 3–5 days.